ATC Transmission Design

Year
2018
Location
Twin Lakes, WI
Client
We Energies
Transmission line upgrades.

Kapur led the design for two new 138kV transmission line projects in Twin Lakes, Wisconsin.

The Y-102 project included rebuilding and converting all overhead and underground 8kV distribution facilities to 24.9kV and reframing virtually all distribution system poles with 13-foot cross-arms. This included 1.9 miles of overhead rebuilding and approximately 1,300 feet of underground cable installation.

The X-105 project was done in two stages. Stage 1 included rebuilding and converting all overhead and underground 8kV distribution facilities to 24.9kV and reframing virtually all distribution system poles with 13-foot cross-arms. This prep work for transmission tower installation covered nearly 8 miles. Stage 2 included attachment of the distribution lines and equipment to ATC towers and rebuild of 8kV lines near Spring Valley SS. The total distance for this work was approximately 8.5 miles.

Services
  • Construction plans, specifications, & estimates
  • Customer service
  • Electric design
  • Environmental
  • Erosion control
  • Field survey
  • Permitting
  • Utility coordination
New distribution system utility poles along a country road.
New distribution system utility poles along a country road.
New distribution system utility poles along a country road.
New distribution system utility poles along a road in Twin Lakes, WI.