Kapur’s construction engineers, technicians, and surveyors are some of the most respected in the industry, and they are on the grade with one goal in mind – to deliver the highest-quality construction projects in the safest and most efficient manner possible.

Our diverse knowledge of construction practices and excellent relationships with contractors and suppliers enable us to build your projects efficiently and cost-effectively.

Our experienced staff’s dedication and teamwork are recognized throughout the industry, and our “get- it-done” attitude results in quick issue resolution, helping project stakeholders avoid delays and cost overruns. To provide your project with the most qualified people, Kapur’s staff provides a full suite of technical certifications as well as testing equipment.

GPS rovers enable our team to quickly verify construction accuracy while simultaneously obtaining quantities, providing clients with daily running totals. Rovers also provide real-time, as-built information available for clients’ use immediately upon completion of construction.

Our company’s expertise in working with digital 3D models assists our construction staff in ensuring your project is built to the highest level of accuracy and facilitates efficient construction. Our 3D models include a conflict detection process that alleviates issues and identifies design flaws before any equipment arrives on site.

Services include:

  • Contract administration
  • Construction inspection
  • Construction plan reviews
  • Construction survey
  • Materials sampling/testing
    • Aggregate sampling
    • Bridge coating inspection (Level 1 & 2)
    • Concrete field testing
    • Soils/HMA nuclear density testing
  • Record drawings
Career Opportunities

Ready to go all in with a career at Kapur? We'd love to have you. Browse our open positions and submit your resume.

Become All In
Featured Project
Project ImgRead More

Kapur successfully managed the design and construction of 11 alley sections, implementing green infrastructure in four alleys to improve stormwater management while saving the Village over $85,000.

Kapur addressed safety concerns post-stormwater pipe collapse, providing comprehensive assessment, design, and construction management services for bluff restoration and outlet structure installation.

We conduct thorough engineering investigations on sanitary sewer infrastructure spanning over 100,000 linear feet, adhering to strict industry standards and providing comprehensive rehabilitation recommendations for local municipalities.

Kapur’s work included 8,427 square yards of 12.5-inch concrete pavement and 5,035 square yards of high early concrete pavement repair on a 4.2-mile stretch of interstate freeway.

I-41 (South Segment)
Brown County, WI
I-41 (South Segment)
Brown County, WI

Kapur provided the overall administration of this $203 million freeway project constructed over three separate contracts, culminating in the complex reconstruction of 8 miles of I-41.

Indiana Avenue
Sheboygan County, WI
Indiana Avenue
Sheboygan County, WI

Kapur helped transform Indiana Avenue into a modern urban roadway in Sheboygan County, overseeing extensive reconstruction, including lane reduction, bike lanes, and structural improvements.

STH 13
Price County, WI
STH 13
Price County, WI

Kapur delivered over 20 miles of rural highway reconditioning, which included surface milling, Percent Within Limits paving, and testing of over 26,000 tons of Hot Mix Asphalt.

STH 17
Oneida & Vilas Counties, WI
STH 17
Oneida & Vilas Counties, WI

Kapur was chosen to oversee the reconditioning of STH 17, a vital rural highway in northern Wisconsin, with a 1.5-inch mill and HMA overlay, garnering the 2021 WisDOT Statewide Excellence in Asphalt Paving Award for the exceptional quality of work.

STH 20
Racine County, WI
STH 20
Racine County, WI

Kapur provided the overall administration of the contract for this $203 million project consisting of the complex reconstruction of 8 miles of I-41 and the full reconstruction of three separate interchanges over three separate contracts.

Kapur spearheaded the project, which included 70,000 cubic yards of excavation, over 50,000 square yards of concrete pavement, 100,000 square feet of sidewalk, and five signalized intersections.

STH 33 Roundabout
Ozaukee County, WI
STH 33 Roundabout
Ozaukee County, WI

Kapur contributed to the contract administration for the 0.31-mile roundabout project at the STH 33/CTH I intersection, transitioning it from a two-lane stop to a free-flowing roundabout.

STH 50
Kenosha, WI
STH 50
Kenosha, WI

STH 50 underwent significant urban modernization and reconstruction, expanding to a six-lane facility, making it one of the largest projects in WisDOT's Southeast Region history.

Kapur helped with the construction that also provided a connection between STH 100 and the 12-mile Hank Aaron State Trail and roadway maintenance of Swan Boulevard near I-41.

WIS 100
Milwaukee County, WI
WIS 100
Milwaukee County, WI

While tackling the Zoo Interchange and I-894 reconstruction, Kapur successfully navigated the rehabilitation of this major urban roadway, enhancing five intersections with significant improvements.