Accurate assessment of environmental issues directly impacts the intrinsic value of an engineering project.

The Remediation Department provides complete, turnkey services for your environmental needs. We specialize due diligence site assessments, including soil and groundwater sampling and analysis, remedial actions involving underground and aboveground storage tank removal, excavations of contaminated soil, and groundwater monitoring. Our team also provides plans and specifications for building demolition, and asbestos and lead-based paint abatement.

Our Environmental Engineering Department brings worldwide experience in the evaluation, modeling, planning, permitting, design, and construction monitoring of environmental projects. Let us bring our expertise to your next project.

Services include:

  • Due diligence (Phase I and II Environmental Site Assessments)
  • Records Search with Risk Assessment (RSRA)
  • Building demolition plans, specifications, & oversight
  • Remediation design & construction monitoring
  • Environmental Site Assessment (WisDOT Phase I through Phase IV)
  • Federal & state grant applications
  • Hazardous waste studies
  • Lead & asbestos inspection/abatement
  • Soil & groundwater sampling/analysis evaluation
  • Storage tank removal
Career Opportunities

Ready to go all in with a career at Kapur? We'd love to have you. Browse our open positions and submit your resume.

Become All In
Featured Project
Project ImgRead More

Kapur was retained to perform a pre-demolition property assessment for 50 parcels, which included asbestos inspection, lead-based paint survey, and hazardous waste inventory.

Burlington Landfill
Burlington, WI
Burlington Landfill
Burlington, WI

Exceeding expectations on an initial project, Kapur earned an extended contract with the City of Burlington to help advance a Landfill Closure Plan in accordance with Wisconsin Administrative Code.

Kapur helped the largest transit agency in Wisconsin carry out a location transformation sustainably and responsibly by exceeding the Wisconsin Department of Natural Resources expectations.

Kapur helped turn a former Park and Ride into a development, supervising the installation of 18 soil borings and collecting 22 soil samples for laboratory analysis in the process.

Barrett Landfill
New Berlin, WI
Barrett Landfill
New Berlin, WI

Kapur's environmental team oversees the annual monitoring of 29 gas probes, 15 private water supply wells, and 17 groundwater monitoring wells/piezometers for the Barrett Landfill.

Kapur's environmental investigation and civil engineering services played a crucial role in transforming the formerly blighted brownfields of St. Augustine Preparatory Academy into a picturesque campus serving grades K-4 through 12.

Cristo Rey Jesuit High School entrusted Kapur with environmental consulting on a redevelopment project, which included managing soil contamination and lowering costs through strategic planning and efficient execution.