Our experience in this discipline includes an extensive array of transportation bridge design and pedestrian bridge projects, including steel and prestressed concrete girder bridges/viaducts and concrete, steel, and masonry arches.
We are experienced in project development documentation, hydraulic analysis/risk assessment, preliminary and final bridge design plans (replacement, repair, and rehabilitation), construction observation and administration, preparation of inventory and bridge rating forms, and conducting annual bridge inspection, public hearings, scour analysis, permit applications, preliminary survey, approach design, cost analysis/estimate, survey layout, and feasibility studies.
Other projects have included building foundation design, underground wastewater structures, and water storage tank rehabilitation.
Services include:
Ready to go all in with a career at Kapur? We'd love to have you. Browse our open positions and submit your resume.
Become All InThe Robert Street bridge undergoes a comprehensive upgrade, winning accolades with the WisDOT Excellence in Design award in the Southwest Region.
Read MoreKapur completed preliminary and final design services for a two-cell box culvert replacement and a new one-cell box culvert, facilitating the expansion of highways and access to key areas in the Wisconn Valley development.
With water levels rising, and the threat of flooding becoming more prominent, Kapur conducted the preliminary and final design for the reconstruction of this decades-old bridge.
Kapur assisted WisDOT in rehabilitating ten bridges and reconstructing one on I-43, employing innovative solutions and detailed studies to enhance structural integrity and safety.
Kapur enhanced the historic dam while preserving its community value, collaborating with regulatory agencies to develop plans, make improvements, and ensure long-term integrity with minimal disruption and maximum environmental benefit.
Collaborating with a national tunnel firm for comprehensive inspection and repair of the Linwood Tunnel, Kapur addressed structural deficiencies and completed over 7,500 linear feet of grout repair within a 90-day timeframe.
Kapur's comprehensive restoration of the Pennsylvania Avenue bridge, responding to the City's vibrant growth and influx of residents, enhances structural integrity, safety, and aesthetic appeal, ensuring a maintenance-free facility for years to come.
The Robert Street bridge undergoes a comprehensive upgrade, winning accolades with the WisDOT Excellence in Design award in the Southwest Region.
Kapur replaced the existing bridges with single flat slab superstructures supported on A5 type abutments and replacing the deck on a prestressed concrete single span bridge.
Utilizing a staged traffic control plan, Kapur exceeded expectations when it came to delivering this three-party contract with Milwaukee County and WisDOT Southeast region.
Kapur played a pivotal role in the Zoo Interchange Reconstruction project, designing intricate bridges and retaining walls with precision and innovation to accommodate complex freeway geometry and site-specific conditions.