Foxconn Development Structures

Year
Location
Racine & Kenosha Counties, WI
Client
WisDOT SE Region
Supporting your commute through structural design.

Kapur provided preliminary and final design services for a two-cell box culvert replacement which carries the expansion of CTH KR to a two-lane rural to a six-lane urban highway over the Kilbourn Ditch. The two-cell structure is 293 feet long, has an 11-foot span by 9-foot rise, and is 1 foot imbedded.

As part of this project, Kapur also delivered the preliminary and final design for a new one-cell box culvert carrying Wisconn Valley Way over a tributary of the Kilbourn Ditch. This new four-lane divided facility is on new alignment connecting CTH KR to STH 11, and provides access to Braun Road.

Services
  • Agency coordination
  • Environmental document
  • Field survey
  • Permitting
  • Preliminary plans
  • Public involvement
  • Right-of-way plat
  • Structure design
  • Structure survey report
  • Utility coordination
Stormwater collecting in the completed box culvert under the roadway.
Aerial photo of the roadway crossing over the completed box culvert.
Aerial photo of the roadway crossing over the completed box culvert.
Water in the ditch flowing through the completed culvert.