STH 20 Bridges

Year
2019-2020
Location
Racine County, WI
Client
WisDOT SE Region
New bridges, new approaches, new STH 20.

This project included the preliminary and final design for the reconstruction of two bridges as well as a deck replacement and rehabilitation of a single-span bridge along STH 20.

The project involved replacing existing bridges with single flat slab superstructures supported on A5 type abutments for two bridges and replacing the deck on a prestressed concrete single-span bridge. The project also included field survey, a structure survey report, a hydraulic report, geotechnical investigations, and preliminary and final roadway and bridge plans.

Services
  • Agency coordination
  • Environmental document
  • Field survey
  • Final structure design
  • Hydraulic analysis
  • Permitting
  • Preliminary plans
  • PS&E
  • Public involvement
  • Right-of-way plat
  • Structure survey report
  • Utility coordination
One of the completed concrete bridge on STH 20.
Roadway leading up to one of the STH 20 reconstructed bridges.
Vehicles crossing over one of the reconstructed STH 20 bridges.
One of the completed single-span concrete bridges on STH 20.