Cristo Rey Jesuit High School

Year
2020
Location
Milwaukee, WI
Client
Bray Architects
New school; new location; new opportunities.

Since opening their doors in Milwaukee for the first freshmen class in 2015 and moving into a new facility in 2020, Cristo Rey has become one of the premier urban city high schools in Milwaukee. Kapur has been involved with Cristo Rey since 2017 as they were searching for a location to build a new high school.

As part of our turn-key site design services, we provided environmental investigation at the new location in 2018, including an analysis of the existing methane control system. As the project proceeded we subsequently provided survey, site design, landscape architecture, field design, and overall stormwater management services.

Services
  • Access/parking/traffic flow
  • Civil/site design
  • Demolition plan
  • Erosion control plan
  • Field survey
  • Geometric plan
  • Grading plan
  • Landscape architecture
  • Permitting
  • Stormwater management
  • Utility plan
The completed parking lot and internal roadway built in front of the school.
Exterior of the new high school building with landscaping and paved walkways up to the school.
Landscaping and storm drains along the road on the exterior of the school building.
Sidewalk with storm drains along the road on the exterior of the school building.
No items found.